English   Espaņol   French  
Search:
SEAPA SEAPA Oyster Baskets


Baskets Assembly Information

Terminology

 
1.Locking pin housing
2.Female hooking mechanism
3.Locking pin
4.     Male hooking mechanism

Assembly Information

 
Instructions
1. Fold basket into a cylinder with hooks facing outwards. 
This is generally a lot easier to do in warm weather, particularly with the 3mm and 6mm baskets.  Some farmers will use a fan heater to blow hot air into the box of basket mesh before assemblyWarning: Ensure you are watching your baskets at all times, you do not want to melt them!   
Assembly Information

2. Starting from the middle, slide the male locking mechanism under the female locking mechanism.

Assembly Information

3. Lift the male locking mechanism into the female locking mechanism.

Assembly Information

4. Slide male mechanism into built-in slit until firmly secure.

Assembly Information

5. Once all of the locking mechanisms have been joined, ensure the locking pins are pressed firmly into their housing.

 The Assembly Process can be made even easier with the use of a jig.  Click here to see how this is done.

For Multipurpose Basket construction, please download the instruction booklet .

Assembly Information